Intuitive Machines, LLC

CLPSLunar science and techSubcontractor to 3
Lunar obligations
$470M
as prime
Lunar awards
11
as prime
Its subcontractors
0
none reported
Primes it works for
3
$9.6M in subawards

Who it subcontracts to

No subawards reported under its lunar awards.

Who it works for

  1. AEROSPACE SUPPORT

  2. SHADOWCAM: SEEING IN THE DARK

  3. SUBCONTRACTOR LABOR

Lunar awards as prime

AwardDescriptionPeriodObligated
80JSC019F0165LUNAR SURFACE TRANSPORTATION-NASA PROVIDED LUNAR PAYLOAD (NPLP) DELIVERY2019-05-30 → 2024-11-30$117M
80JSC024F0079COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)2024-08-29 → 2028-08-31$90M
80JSC022F0022CLPS TASK ORDER CP-11 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON2021-11-17 → 2027-10-02$86M
80JSC021F0004COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER (TO) POLAR RESOURCE ICE-MINING EXPERIMENT-1 (PRIME-1) LUNAR SURFACE PAYLOAD DELIVERY -LUNAR POLE2020-10-16 → 2026-07-31$56M
80JSC026F7009CLPS TASK ORDER CT-4 PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON.2026-03-25 → 2031-05-31$47M
80LARC21C0007DEPLOYABLE HOPPER FOR EXTREME LUNAR SURFACE ACCESS. DEVELOP AND DEMONSTRATE A SMALL ROBOTIC HOPPER, DEPLOYED AS A SECONDARY PAYLOAD FROM THE NOVA-C LANDER, THAT CAN PROVIDE ACCESS TO EXTREME ENVIRONMENTS AND LOCATIONS OF INTEREST ON THE LUNAR SURFACE2021-03-01 → 2025-10-01$41M
80GSFC24CA018NEAR SPACE NETWORK (NSN) SERVICES (SUBCATEGORY 2.2 GEO TO CIS-LUNAR RELAY)2024-10-01 → 2029-09-30$27M
80HQTR25CA004THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. THE CONTRACTOR SHALL PERFORM A STUDY WITH THE OBJECTIVE OF DEVELOPING A LOGISTICS HANDLING AND OFFLOADING CONCEPT.2025-04-30 → 2026-09-30$3.7M
80HQTR26C0001SUSTAINED OPERATIONS OF THE SHADOWCAM INSTRUMENT ABOARD THE KOREA PATHFINDER LUNAR ORBITER (KPLO) MISSION AS DESCRIBED IN ATTACHMENT A, STATEMENT OF WORK (SOW).2026-04-01 → 2027-03-31$1.9M
80GSFC25CA007NEAR SPACE NETWORK (NSN) SERVICES (SUBCATEGORIES 1.2 (GEO TO CISLUNAR DIRECT TO EARTH (DTE)) AND 1.3 (XCISLUNAR DTE))2025-02-01 → 2029-09-30$1.0M
FA864921P0972INTUITIVE MACHINES NON-DEEP SPACE NETWORK LUNAR TRACKING NETWORK ENHANCEMENT FOR XEGO OPERATION.2021-04-13 → 2021-07-19$45K

Source: USAspending.gov prime award and subaward data (public domain), refreshed daily; last refreshed 2026-10-19 06:18 UTC.

Amounts are obligated to date, not contract ceilings. An award counts as lunar when its published description is about the Moon, and programs are tagged from that text; repeated or impossible subaward reports are shown but not summed. Subawards are only as complete as primes report them.