Dynetics, Inc.
Lunar obligations
$300Mas prime
Lunar awards
3as prime
Its subcontractors
61$13M reported
Primes it works for
0none reported
Who it subcontracts to
CONCEPTUAL DESIGN & REVIEW
PRELIMINARY DESIGNS & REVIEWS
- Psionic, Inc.$940K
PSIONIC NAVIGATION DOPPLER LIDAR AND RENTAL EQUIPMENT
SUBCONTRACT LABOR
SUBCONTRACT LABOR
PANTHR 20X8 LARGE AREA DISPLAYS, 75FT PANTHR DISPLAY RADIATION TEST CABLES WITH SIGNAL REPEAT, COPPER BEAM SHAPING APERTURE WITH MOUNTING BRACKET
- Dynamic Concepts LLC$360K
PRELIMINARY DESIGNS & REVIEWS
HONEYWELL IMU ENGINEERING UNIT
- Barber-nichols, LLC$338K
LABOR SERVICES
- Moog Inc$326K
SUBCONTRACTOR LABOR
- Taylor Devices Inc$300K
SUBCONTRACTOR LABOR
- Lbyd Inc$300K
CONTRACT LABOR
SUBCONTRACTOR LABOR
- J.F. Taylor, Inc.$243K
SUBCONTRACTOR LABOR
- Creare LLC$226K
SUBCONTRACT LABOR
Who it works for
Not reported as a subcontractor on lunar awards.
Lunar awards as prime
| Award | Description | Period | Obligated |
|---|---|---|---|
| 80MSFC20C0035 | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM INTEGRATED LANDER. | 2020-05-13 → 2021-08-23 | $240M |
| 80MSFC21CA016 | THIS HLS EFFORT FURTHER DEVELOPS SUSTAINING LUNAR LANDER CONCEPT DEVELOPMENT THROUGH DESIGN, TRADE STUDIES AND JOINT WORKING GROUPS AND PERFORM RISK MITIGATION ACTIVITIES TO REDUCE SUSTAINABLE LUNAR LANDER DEVELOPMENT RISKS. | 2021-09-27 → 2023-07-13 | $57M |
| 80MSFC19C0017 | NASA HUMAN LANDING SYSTEM (HLS) REFUELING ELEMENT - CONTRACTOR SHALL REFINE THE ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS AND COMMON INTERFACES REQUIRED TO ENABLE THE HLS TO PROVIDE HUMAN LANDING CAPABILITY; INFORM OVERALL HLS REQUIREMENTS, PROVIDE UNDERSTANDING OF ELEMENT DESIGNS, SCHEDULES AND COSTS; IDENTITY KEY ELEMENT TECHNOLOGY MATURATION AREAS, AND IMPLEMENT DESCENT TECHNOLOGY MATURATION PLANS; IDENTIFY ANY LONG-LEAD PROCUREMENT ITEMS | 2019-05-30 → 2020-07-21 | $3.2M |