S & B Precision Machines Consulting LLC
Who it subcontracts to
No subawards reported under its lunar awards.
Who it works for
THIS STATEMENT OF WORK (SOW) IS PREPARED FOR SYSTEM ENGINEERING SUPPORT TO DEVELOP THE 2LEAD (LUNAR LIBS EXPLORATION AND ANALYSIS DEVICE) INSTRUMENT FROM TRL 4 TO TRL 6. DURING PY2, THE SUBRECIPIENT WILL PROVIDE SYSTEMS ENGINEERING SUPPORT TO THE PI WITH THE OBJECTIVE OF DELIVERING AN ENGINEERING DEVELOPMENT UNIT (EDU) WITH ENVIRONMENTAL TESTING RESULTS DEMONSTRATING OPERATION IN A SIMULATED LUNAR SURFACE ENVIRONMENT. THE WORK BUILDS ON THE PROGRESS ACHIEVED DURING PY1, INCLUDING THE DESIGN AND TESTING OF A BREADBOARD FOCUS AND SCAN MECHANISM (FSM). SYSTEMS ENGINEERING WORK MAY INCLUDE THE FOLLOWING TASKS AND ADDITIONAL TASKS REQUESTED BY THE PI. REVIEW EQUIPMENT SPECIFICATIONS FOR SUITABILITY AND FEASIBILITY TO MEET THE PROJECT TECHNICAL OBJECTIVES REVIEW 2LEAD INSTRUMENT DESIGNS, SCHEMATICS AND ANALYSIS FOR ACCURACY AND COMPLETENESS DESIGN CUSTOM OPTOMECHANICAL HARDWARE FOR THE 2LEAD INSTRUMENT PERFORM ANALYSIS AS NEEDED TO SUPPORT THE BUILDING AND TESTING OF THE 2LEAD INSTRUMENT PARTICIPATE IN BUILDING AND TESTING THE 2LEAD INSTRUMENT ON-SITE AT WASHINGTON UNIVERSITY, AS DIRECTED BY THE PI PARTICIPATE IN TECHNICAL REVIEWS FOR THE 2LEAD INSTRUMENT PREPARE TECHNICAL DOCUMENTATION THE PI HAS EXPRESSED A NEED FOR AVIONICS AND SOFTWARE DEVELOPMENT SUPPORT. TECHNICAL OVERSIGHT OF EXTERNAL CONTRACTORS PERFORMING THE DETAILED DESIGN AND DEVELOPMENT WORK IS INCLUDED IN THIS SOW. DURING THE PROJECT, SUBRECIPIENT’S CURRENT LABOR RATE WILL BE IN EFFECT. WASHINGTON UNIVERSITY WILL BE INVOICED SEMI-MONTHLY (EVERY 2 WEEKS) FOR ACTUAL LABOR PERFORMED. MATERIALS AND TRAVEL (IF REQUIRED) ARE NOT INCLUDED IN THE LABOR RATE AND SHALL BE REIMBURSED SEPARATELY. ANY SOFTWARE LICENSES REQUIRED FOR THE SYSTEMS ENGINEERING ROLE (E.G., CAD SOFTWARE, OPTICAL ANALYSIS, ETC.) ARE ASSUMED TO BE PROVIDED BY THE PI’S INSTITUTION.