Lockheed Martin Corp
Who it subcontracts to
OUTSIDE PROCESSING - TEST SAMPLES
N/A ENGINEERING SERVICES
##FOR SUBCONTRACT WORK WITH RED CANYON##
ENGINEERING SERVICES
##810010##TEMPERATURE RECORD. ##820010##TEST CHARGE ##TC275-1/T300 1K##125 GSM 51% RC 50. ##TC275-1/T300 3K##70 GSM 40% RC 12 UD
- Redwire Space$80K
IBDM EDU DOCKING DEMO SUPT INCL TRAVEL
SHIPPING CHARGE ##13523##TTE LAB SWITCH SPACE ##12541##TTE-END SYSTEM LAB SPACE PCIE
- Proto Labs, Inc.$43K
##VSAT_8948539-013## ##VSAT_8948539-025## ##VSAT_8948539-031_001## ##VSAT_8948539-031## ##VSAT_8948568-019## ##VSAT_BELT_CLAMP## ## VSAT_BELT_GUIDE_RAMP## ##VSAT_BELT_RING## ##VSAT_BELT_SPOOL_FLANGE2## ##VSAT_BELT_SPOOL_FLANGE## ##VSAT_BLANKET_BRACKET1## ##VSAT_BLANKET_BRACKET2## ##VSAT_BOTTOM_PLATE## ##VSAT_COMP_SPRING_BRACKET## ##VSAT_DEPLOYER_MOTOR_BRACKET## ##VSAT_EXTENSION_PLATE1## ##VSAT_EXTENSION_PLATE2## ##VSAT_EYE_BRACKET## ##VSAT_GEAR_BUSHING## ##VSAT_GEAR_PLATE## ##VSAT_INNER_RETAINER## ##VSAT_LEFT_HOUSING## ##VSAT_MAST_CLAMP## ##VSAT_MAST_GEAR_FLANGE## ##VSAT_MAST_SPOOL_BUSHING## ##VSAT_MAST_SPOOL_FLANGE## ##VSAT_MAST_SPOOL_SHAFT## ##VSAT_MIDDLE_FRONT_PLATE2## ##VSAT_MIDDLE_FRONT_PLATE## ##VSAT_MOTOR_MOUNT_PLATE##. ##VSAT_MOTOR_PLATE##. ##VSAT_OUTER_RETAINER## ##VSAT_PIVOT_BRACKET1_2## ##VSAT_PIVOT_BRACKET2_2## ##VSAT_RETAINER_TUBE## ##VSAT_RIGHT_HOUSING## ##VSAT_SPOOL_FLANGE_EXTRUSION## ##VSAT_TEFLON_SPACER_2## ##VSAT_TEFLON_SPACER_3## ##VSAT_TEFLON_SPACER## ##VSAT_TOP_BACK_PLATE## ##VSAT_TOPCOVER## ##VSAT_TOP_FRONT_PLATE## ##VSAT_TOP_PLATE##
DARPA DRACO MODAL ANALYSIS
##SKLVSAT501001-301##UPPER DECK. ##SKLVSAT501002-301##LOWER DECK
Who it works for
LM TO PROVIDE SAMPLE HANDLING SUBSYSTEM AND SUPPORT FOR ARM MANIPULATION FOR SAMPLE COLLECTION AS OUTLINED IN THE SOW.
- Lockheed Martin Corp$246K
N/A ENGINEERING SERVICES
Lunar awards as prime
| Award | Description | Period | Obligated |
|---|---|---|---|
| 80MSFC21CA017 | THIS HLS EFFORT FURTHER DEVELOPS SUSTAINING LUNAR LANDER CONCEPT DEVELOPMENT THROUGH DESIGN, TRADE STUDIES AND JOINT WORKING GROUPS AND PERFORM RISK MITIGATION ACTIVITIES TO REDUCE SUSTAINABLE LUNAR LANDER DEVELOPMENT RISKS. | 2021-09-27 → 2024-08-08 | $51M |
| 80LARC21CA011 | THE CONTRACTOR IS TO DESIGN, PROTOTYPE, AND TEST THE LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE. | 2021-09-28 → 2025-03-31 | $6.5M |
| 80MSFC19C0030 | NASA HUMAN LANDING SYSTEM (HLS) DESCENT STUDY ELEMENT | 2019-05-30 → 2020-02-28 | $6.0M |
| 80HQTR25CA011 | THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. | 2025-07-09 → 2026-09-30 | $5.0M |
| HR001121C0075 | THE DEMONSTRATION ROCKET FOR AGILE CISLUNAR OPERATIONS (DRACO) PROGRAM, PHASE 1 TRACK B - DEVELOPMENT OF AN OPERATIONAL SYSTEM AN DEMONSTRATION SYSTEM FOR A NUCLEAR THERMAL PROPULSION (NTP) SYSTEM ON ORBIT. | 2021-02-26 → 2022-09-15 | $2.9M |
| 80NSSC25K7691 | EXECUTE A BALANCED SCIENCE PROGRAM BASED ON DISCIPLINE-SPECIFIC GUIDANCE FROM THE NATIONAL ACADEMIES OF SCIENCES ENGINEERING AND MEDICINE ADMINISTRATION PRIORITIES AND DIRECTION FROM CONGRESS. PARTICIPATE AS A KEY PARTNER AND ENABLER IN THE AGENCY S EXPLORATION INITIATIVE FOCUSING ON SCIENTIFIC RESEARCH OF ON AND FROM THE MOON LUNAR ORBIT MARS AND BEYOND. ADVANCE DISCOVERY IN EMERGING FIELDS BY IDENTIFYING AND EXPLOITING CROSS-DISCIPLINARY OPPORTUNITIES BETWEEN TRADITIONAL SCIENCE | 2025-02-14 → 2028-02-13 | $350K |