Lockheed Martin Corp

Lunar obligations
$71M
as prime
Lunar awards
6
as prime
Its subcontractors
10
$1.2M reported
Primes it works for
2
$4.2M in subawards

Who it subcontracts to

  1. OUTSIDE PROCESSING - TEST SAMPLES

  2. N/A ENGINEERING SERVICES

  3. ##FOR SUBCONTRACT WORK WITH RED CANYON##

  4. ENGINEERING SERVICES

  5. ##810010##TEMPERATURE RECORD. ##820010##TEST CHARGE ##TC275-1/T300 1K##125 GSM 51% RC 50. ##TC275-1/T300 3K##70 GSM 40% RC 12 UD

  6. IBDM EDU DOCKING DEMO SUPT INCL TRAVEL

  7. SHIPPING CHARGE ##13523##TTE LAB SWITCH SPACE ##12541##TTE-END SYSTEM LAB SPACE PCIE

  8. ##VSAT_8948539-013## ##VSAT_8948539-025## ##VSAT_8948539-031_001## ##VSAT_8948539-031## ##VSAT_8948568-019## ##VSAT_BELT_CLAMP## ## VSAT_BELT_GUIDE_RAMP## ##VSAT_BELT_RING## ##VSAT_BELT_SPOOL_FLANGE2## ##VSAT_BELT_SPOOL_FLANGE## ##VSAT_BLANKET_BRACKET1## ##VSAT_BLANKET_BRACKET2## ##VSAT_BOTTOM_PLATE## ##VSAT_COMP_SPRING_BRACKET## ##VSAT_DEPLOYER_MOTOR_BRACKET## ##VSAT_EXTENSION_PLATE1## ##VSAT_EXTENSION_PLATE2## ##VSAT_EYE_BRACKET## ##VSAT_GEAR_BUSHING## ##VSAT_GEAR_PLATE## ##VSAT_INNER_RETAINER## ##VSAT_LEFT_HOUSING## ##VSAT_MAST_CLAMP## ##VSAT_MAST_GEAR_FLANGE## ##VSAT_MAST_SPOOL_BUSHING## ##VSAT_MAST_SPOOL_FLANGE## ##VSAT_MAST_SPOOL_SHAFT## ##VSAT_MIDDLE_FRONT_PLATE2## ##VSAT_MIDDLE_FRONT_PLATE## ##VSAT_MOTOR_MOUNT_PLATE##. ##VSAT_MOTOR_PLATE##. ##VSAT_OUTER_RETAINER## ##VSAT_PIVOT_BRACKET1_2## ##VSAT_PIVOT_BRACKET2_2## ##VSAT_RETAINER_TUBE## ##VSAT_RIGHT_HOUSING## ##VSAT_SPOOL_FLANGE_EXTRUSION## ##VSAT_TEFLON_SPACER_2## ##VSAT_TEFLON_SPACER_3## ##VSAT_TEFLON_SPACER## ##VSAT_TOP_BACK_PLATE## ##VSAT_TOPCOVER## ##VSAT_TOP_FRONT_PLATE## ##VSAT_TOP_PLATE##

  9. DARPA DRACO MODAL ANALYSIS

  10. ##SKLVSAT501001-301##UPPER DECK. ##SKLVSAT501002-301##LOWER DECK

Who it works for

  1. LM TO PROVIDE SAMPLE HANDLING SUBSYSTEM AND SUPPORT FOR ARM MANIPULATION FOR SAMPLE COLLECTION AS OUTLINED IN THE SOW.

  2. N/A ENGINEERING SERVICES

Lunar awards as prime

AwardDescriptionPeriodObligated
80MSFC21CA017THIS HLS EFFORT FURTHER DEVELOPS SUSTAINING LUNAR LANDER CONCEPT DEVELOPMENT THROUGH DESIGN, TRADE STUDIES AND JOINT WORKING GROUPS AND PERFORM RISK MITIGATION ACTIVITIES TO REDUCE SUSTAINABLE LUNAR LANDER DEVELOPMENT RISKS.2021-09-27 → 2024-08-08$51M
80LARC21CA011THE CONTRACTOR IS TO DESIGN, PROTOTYPE, AND TEST THE LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE.2021-09-28 → 2025-03-31$6.5M
80MSFC19C0030NASA HUMAN LANDING SYSTEM (HLS) DESCENT STUDY ELEMENT2019-05-30 → 2020-02-28$6.0M
80HQTR25CA011THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES.2025-07-09 → 2026-09-30$5.0M
HR001121C0075THE DEMONSTRATION ROCKET FOR AGILE CISLUNAR OPERATIONS (DRACO) PROGRAM, PHASE 1 TRACK B - DEVELOPMENT OF AN OPERATIONAL SYSTEM AN DEMONSTRATION SYSTEM FOR A NUCLEAR THERMAL PROPULSION (NTP) SYSTEM ON ORBIT.2021-02-26 → 2022-09-15$2.9M
80NSSC25K7691EXECUTE A BALANCED SCIENCE PROGRAM BASED ON DISCIPLINE-SPECIFIC GUIDANCE FROM THE NATIONAL ACADEMIES OF SCIENCES ENGINEERING AND MEDICINE ADMINISTRATION PRIORITIES AND DIRECTION FROM CONGRESS. PARTICIPATE AS A KEY PARTNER AND ENABLER IN THE AGENCY S EXPLORATION INITIATIVE FOCUSING ON SCIENTIFIC RESEARCH OF ON AND FROM THE MOON LUNAR ORBIT MARS AND BEYOND. ADVANCE DISCOVERY IN EMERGING FIELDS BY IDENTIFYING AND EXPLOITING CROSS-DISCIPLINARY OPPORTUNITIES BETWEEN TRADITIONAL SCIENCE2025-02-14 → 2028-02-13$350K

Source: USAspending.gov prime award and subaward data (public domain), refreshed daily; last refreshed 2026-10-19 06:18 UTC.

Amounts are obligated to date, not contract ceilings. An award counts as lunar when its published description is about the Moon, and programs are tagged from that text; repeated or impossible subaward reports are shown but not summed. Subawards are only as complete as primes report them.