Brimrose Technology Corp

Lunar obligations
$3.5M
as prime
Lunar awards
2
as prime
Its subcontractors
0
none reported
Primes it works for
0
none reported

Who it subcontracts to

No subawards reported under its lunar awards.

Who it works for

Not reported as a subcontractor on lunar awards.

Lunar awards as prime

AwardDescriptionPeriodObligated
80NSSC19C0057NASA AMES RESEARCH CENTER HAS BEEN COLLABORATING WITH BRIMROSE TO DEVELOP A SMALL, LOW-POWER POINT SPECTROMETER TO BE INCLUDED INTO THE NEAR INFRARED VOLATILES SPECTROMETER (NIRVSS) INSTRUMENT. THROUGH AN STTR CONTRACT, BRIMROSE SUCCESSFULLY DEVELOPED A DUAL-CHANNEL ACOUSTO-OPTIC TUNABLE FILTERS (AOTF) SPECTROMETER THAT OPERATES ACROSS 1300 AND 4000NM. AN AOTF IS AN ALL SOLID-STATE, TUNABLE FILTER WITH NO MOVING PARTS. THE AOTF IS A HIGH THROUGHPUT AND HIGH-SPEED, PROGRAMMABLE DEVICE CAPABLE OF ACCESSING WAVELENGTHS AT RATES OF 100 KHZ. INITIAL WORK HAS BEEN CONDUCTED VIA A SBIR PHASE III TO DEMONSTRATE THE AOTF SPECTROMETER WOULD HAVE SUFFICIENT PERFORMANCE TO MEET INSTRUMENT MEASUREMENT REQUIREMENTS. FOLLOWING THIS DEMONSTRATION, PRELIMINARY DESIGN WORK WAS BEGUN WITH BRIMROSE AS PART OF THE CURRENT PHASE II-X STTR CONTRACT. THIS WORK LEAD TO THE DELIVERY OF A FULLY FUNCTIONAL SPECTROMETER ENGINEERING TEST UNIT (ETU) THAT IS VERY FLIGHT-FORWARD IN DESIGN. THIS ETU HAS BECOME THE BASELINE SPECTROMETER FOR THE NIRVSS INSTRUMENT. ALSO PART OF THIS PHASE III EFFORT WAS THE DEVELOPMENT OF A BIFURCATED MULTI-FIBER OPTICAL FIBER CABLE WHICH INTEGRATES THE SPECTROMETER TO THE NIRVSS OBSERVATION BRACKET ASSEMBLY. BRIMROSE IS RESPONSIBLE FOR BOTH THE SPECTROMETER AND THE BIFURCATED OPTICAL FIBER CABLE. THE NIRVSS INSTRUMENT WAS SELECTED AS A SCIENCE AND TECHNOLOGY DEMONSTRATION PAYLOAD VIA THE NASA PROVIDED LUNAR PAYLOAD (NPLP) DEVELOPMENT PROGRAM TO FLY TO THE MOON USING U.S. COMMERCIAL LANDING DELIVERY SERVICES (CLPS). THE CLPS FLIGHT UNIT FOR THIS PROGRAM IS TO BE DELIVERED IN LATE SPRING, 2020. ACCOMMODATION OF THE NIRVSS INSTRUMENT ONTO CLPS LUNAR LANDED SERVICE PROVIDERS WILL OCCUR ONCE THE LANDER PROVIDERS ARE SELECTED (EXPECTED MAY, 2019). THIS SOW DESCRIBES THE NECESSARY TASKS AND DELIVERABLES IN SUPPORT OF THE CLPS FLIGHT UNIT. AS PART OF THIS ACCOMMODATION THE EXACT DIMENSIONS OF THE BIFURCATED MULTI-FIBER OPTICAL FIBER CABLE WILL BE DEFINED. THEREFORE, A LATER SOW MODIFICATION IS ANTICIPATED ONCE THESE DIMENSIONS ARE DEFINED.2019-05-09 → 2025-09-01$3.3M
80NSSC23PB380STTR PHASE I - FAST ELEMENTAL AND MOLECULAR INTERROGATION SENSOR (FEMIS) FOR IN-SITU LUNAR AND MARTIAN RESOURCE UTILIZATION2023-08-03 → 2024-09-02$150K

Source: USAspending.gov prime award and subaward data (public domain), refreshed daily; last refreshed 2026-10-19 06:18 UTC.

Amounts are obligated to date, not contract ceilings. An award counts as lunar when its published description is about the Moon, and programs are tagged from that text; repeated or impossible subaward reports are shown but not summed. Subawards are only as complete as primes report them.