Baja Technology LLC

Subcontractor to 2
Lunar obligations
$0
as prime
Lunar awards
0
as prime
Its subcontractors
0
none reported
Primes it works for
2
$459K in subawards

Who it subcontracts to

No subawards reported under its lunar awards.

Who it works for

  1. BAJA SHALL BE RESPONSIBLE FOR THE FOLLOWING ELEMENTS OF PERFORMANCE IN THE DEVELOPMENT OF THE ELECTRONICS: 1. CONFIGURATION CONTROL RELATIVE TO BAJA GENERATED DRAWINGS AND DOCUMENTS. 2. ESD CONTROLS WHILE ASSEMBLING OR TESTING THE ELECTRONICS. 3. IPC-2221 STANDARD FOR PRINTED CIRCUIT BOARD ARTWORK DESIGN RULES. 4. FPGA DESIGN RULES AND GUIDELINES. 5. EEE PART SELECTION OR RECOMMENDATION IAW NASA AND ESTEC. DELIVERABLES BAJA SHALL SUPPORT THE FOLLOWING PROJECT MEETINGS IN ASSOCIATION WITH THE DEVELOPMENT OF THE XTRA XRD/XF ELECTRONICS AND OTHER PROJECT ACTIVITIES IESC DEVELOPMENT PROJECT DELIVERABLES ITEM NO. DESCRIPTION DUE DATE 1 EEE PARTS LIST END OF YEAR 1 2 CCU, SHM, LVPS, SCE DRAFT SPECIFICATIONS END OF YEAR 1 3 CCU AND SHM SCHEMATICS END OF YEAR 1 4 PRELIMINARY DESIGN REVIEW PACKAGE CONTAINING BLOCK DIAGRAMS, PRELIMINARY SCHEMATICS, PRELIMINARY PARTS LIST, PRELIMINARY FPGA STATE DIAGRAMS, POWER CONSUMPTION CALCULATION, AND DESCRIPTION OF MONITOR PROGRAM FUNCTIONALITY. YEAR 2 5 UPDATED EEE PARTS LIST WITH RECOMMENDATIONS FOR FLIGHT PARTS SELECTION YEAR 2 ITEM NO. DESCRIPTION DUE DATE 6 RECOMMEND PARTS PLACEMENT DRAWING SHOWING THE PREFERRED LOCATION FOR EEE PARTS. YEAR 2 7 EEE PARTS. YEAR 2 8 FPGA PROGRAMMING FILES END OF YEAR 2 9 UPDATED SPECIFICATION DOCUMENT END OF YEAR 2 10 ONE SET OF CCU, SHM, LVPS AND SCE YEAR 2 11 GSE SOFTWARE TWO MONTHS BEFORE END OF YEAR 3 12 FINAL FPGA PROGRAMMING FILES TWO MONTHS BEFORE END OF YEAR 3 13 TECHNICAL PROGRESS REPORTS END OF EACH YEAR PROJECT MEETING BAJA SHALL SUPPORT THE FOLLOWING PROJECT MEETINGS IN ASSOCIATION WITH THE DEVELOPMENT OF THE XTRA XRD/XRF ELECTRONICS AND OTHER PROJECT ACTIVITIES. IESC DEVELOPMENT MEETINGS MEETING DESCRIPTION/PURPOSE DATE REQUIREMENTS REVIEW REVIEW OF THE REQUIREMENTS FOR THE ELECTRONICS. REQUIREMENTS INCLUDE PERFORMANCE, PACKAGING, POWER CONSUMPTION, INTERFACES, SOFTWARE DEVELOPMENT. REVIEW TO BE HELD AT ARC TBD PDR PRELIMINARY DESIGN REVIEW. REVIEW TO BE HELD AT ARC TBD CDR CRITICAL DESIGN REVIEW. REVIEW TO BE HELD AT ARC TBD

  2. ENGINEERING SERVICES FOR THE DEVELOPMENT OF THE ANALOG BOARD(AB) AND DIGITAL BOARD (DB) FPGAS FOR THE LMS PROGRAM.

Source: USAspending.gov prime award and subaward data (public domain), refreshed daily; last refreshed 2026-10-19 06:18 UTC.

Amounts are obligated to date, not contract ceilings. An award counts as lunar when its published description is about the Moon, and programs are tagged from that text; repeated or impossible subaward reports are shown but not summed. Subawards are only as complete as primes report them.