← All landings

Landing day · 🇺🇸 United States · Firefly Aerospace

Blue Ghost Mission 2 (with Elytra Dark and ESA Lunar Pathfinder)

Planned

Near Nassau crater, far side (target region; landing coordinates not published)

Facts last verified against primary sources on 2026-10-13. Mission page →

Launch

no earlier than Jan 2027

Target

24.91°S 177.34°E

Target region (approximate) · 38 km radius

Landing

date not set

Launch no earlier than Jan 2027

Sun · today

−8.16°

W (az 265°) · below the horizon

Earth · today

−67.82°

S (az 178°) · Earth below the horizon

Target region (approximate)

2 km reference ring

Drag to turn · scroll to zoom

Site plan

NSunEarth20 km

North up, true scale around the target point. Arrows: where the Sun and the Earth sit on the horizon at the current time. The dashed outline is the named target region, not a landing ellipse: no ellipse is published.

The sky from the landing site

The landing date is not set yet, so this shows the next 30 days at the target. Predicted by JPL Horizons for a smooth Moon: hills and crater walls are not included, and near the poles they can hide a Sun that is a degree or two up.

-80°-70°-60°-50°-40°-30°-20°-10°0°10°20°30°40°50°60°70°80°NNEESESSWWNWNSun · todayEarth
-100°-50°0°50°100°smooth-Moon horizonOct 19Oct 24Oct 29Nov 3Nov 8Nov 13Nov 18SunEarthtoday
Sun up
50% of the window
Next sunset
2026-11-17 07:00 UTC
Earth up
0% of the window
Earth elevation
-70.9° to -58.7°

Source: JPL Horizons observer tables (DE441, Moon mean-Earth frame), Sun and Earth seen from 24.910°S 177.340°E at 0 m on the 1,737.4 km sphere, hourly, 2026-10-19 to 2026-11-18. “Sun up” means any part of the disk is above the smooth horizon. Method: landing-site sky.

Engine plume: reference distances

N600 m2 km1.0 km
  1. 155 mApollo 12 → Surveyor 3. Apollo 12 landed about 155 m from Surveyor 3, and its plume sandblasted the older lander. source
  2. 600 m1 cm gravel, Apollo-sized lander. Gravel 1 cm across leaves a Lunar Module–sized lander's plume at about 30 m/s and lands within 600 m; NASA gives up to about 1.5 km for 1–10 cm rocks. source
  3. 2 kmNASA heritage-site standoff. NASA recommends targeting touchdown at least 2 km from U.S. lander heritage sites (0.5 km from impact sites). source

No CLPS or Artemis lander has a published plume keep-out distance; these are reference cases, drawn around the target point, not limits for this lander. Fine dust leaves a plume at up to kilometres per second and is not stopped by any ring. No recorded hardware is within 2 km of the target point.

Hardware already nearby

No recorded landing or impact site within 150 km of the target.

Great-circle distance from the target point on the 1,737.4 km sphere, to landing and impact sites in our curated table. The target is a region, so real distances can differ by tens of kilometres.

Landing-day timeline

  1. no earlier than Jan 2027Launch, no earlier than 2027 (NASA: later in 2027) planned

Official livestream links appear here once the operator announces them. We link to streams; we never re-host them.

Sources