Yspm LLC

Subcontractor to 1
Lunar obligations
$0
as prime
Lunar awards
0
as prime
Its subcontractors
0
none reported
Primes it works for
1
$64K in subawards

Who it subcontracts to

No subawards reported under its lunar awards.

Who it works for

  1. TASK ORDER DESCRIPTION CONTRACTOR, IN SUPPORT OF MOREHEAD UNIVERSITY, WILL PERFORM TASKS 1 DURING PHASE I AND TASK 2 DURING PHASE II (OPTIONAL) OF THE PROJECT: PHASE I. 1. TASK 1- DEVELOPMENT OF LUNAR ICECUBE THERMAL MODEL: 1.1. DEVELOPMENT OF THERMAL MODEL OF PAYLOAD AND BUS DETAILED ENOUGH TO DETERMINE HOT SPOTS 1.2. MODEL WILL INCLUDE OPTICAL AND THERMAL PROPERTIES OF MATERIALS AND SPACECRAFT ORBIT. 1.3. PROVIDE THE THERMAL MODEL TO MOREHEAD UNIVERSITY PHASE II (OPTIONAL). 2. TASK -2 DEVELOPMENT OF THERMAL MANAGEMENT SOLUTION FOR LUNAR ICECUBE 2.1. IDENTIFY & STUDY REGIONS OF EXCESSIVE HEAT WHICH ARE GENERATED BY PAYLOAD(S) AND BUS SUBSYSTEMS 2.2. DETERMINE BEST PATHS AND MEANS TO REJECT HEAT IN ORDER TO KEEP CRITICAL COMPONENT TEMPERATURES WITHIN OPERATIONAL LIMITS 2.3. FACILITATE TEMPERATURE DISTRIBUTION INSIDE OF THE S/C WHICH ALLOWS TEMPERATURE OF ALL COMPONENTS TO BE INSIDE OF PERFORMANCE ENVELOPE. 2.4. REDUCTION OF TEMPERATURE GRADIENTS ACROSS THE S/C 

Source: USAspending.gov prime award and subaward data (public domain), refreshed daily; last refreshed 2026-10-19 06:18 UTC.

Amounts are obligated to date, not contract ceilings. An award counts as lunar when its published description is about the Moon, and programs are tagged from that text; repeated or impossible subaward reports are shown but not summed. Subawards are only as complete as primes report them.

Yspm LLC · Hevelius Tracker