Northrop Grumman Systems Corporation
Who it subcontracts to
ENGINEERING SERVICES
ENGINEERING SERVICES AND MATERIALS
FOREIGN VENDOR
- Moog Inc$38M
DEFINITIZE LETTER SUBCONTRACT AND FULLY FUNDED SUBCONTRACT.
OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING
MODIFICATION #31 TO INCREASE FUNDING BY $9,201,322.00
ADDITIONAL LSC FUNDING FOR CONTINUED BUILDS OF AVIONICS HOSTING UNITS (VUC, GCU, TSU)
OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING (SEE FOOTNOTE 7)
MODIFICATION TO DEFINITIZE THE LETTER SUBCONTRACT AND FULLY FUND THE SUBCONTRACTOR.
MODIFICATION TO EXISTING SUBCONTRACT TO ADD FULL FUNDING AMOUNT DUE TO DEFINTIZATION OF LETTER SUBCONTRACT.
FOREIGN VENDOR
- Lucix Corp$6.3M
MODIFICATION TO EXISTING SUBCONTRACT TO SUPPORT THE MANUFACTURING OF THE SSPA/LNA.
ENGINEERING SERVICES
- Parker Hannifin Corp$6.0M
MOD 5 TO DEFINITIZE SUBK AND INCREASE FUNDING FROM $982,978 TO $2,457,445. NET INCREASE AMOUNT IS $1,474,467.00
ENGINEERING SERVICES
Who it works for
Not reported as a subcontractor on lunar awards.
Lunar awards as prime
| Award | Description | Period | Obligated |
|---|---|---|---|
| NNH15CN76C | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | 2015-09-03 → 2029-05-31 | $1.8B |
| 80MSFC21CA018 | THIS HLS EFFORT FURTHER DEVELOPS SUSTAINING LUNAR LANDER CONCEPT DEVELOPMENT THROUGH DESIGN, TRADE STUDIES AND JOINT WORKING GROUPS AND PERFORM RISK MITIGATION ACTIVITIES TO REDUCE SUSTAINABLE LUNAR LANDER DEVELOPMENT RISKS. | 2021-09-27 → 2023-08-11 | $46M |