National Institute of Aerospace Associates
Lunar obligations
$1.1Mas prime
Lunar awards
5as prime
Its subcontractors
0none reported
Primes it works for
1$830K in subawards
Who it subcontracts to
No subawards reported under its lunar awards.
Who it works for
SUBCONTRACT FUNDING
Lunar awards as prime
| Award | Description | Period | Obligated |
|---|---|---|---|
| 80JSC025F0034 | NOIS3-005 HUMAN LANDING SYSTEM COMPETITION (HLSC) | 2025-07-24 → 2026-09-30 | $830K |
| 80LARC20F0058 | TRADE STUDY, MODELING, AND ANALYSIS OF LUNAR SURFACE POWER DISTRIBUTION OPTIONS. THE OBJECTIVE OF THIS TRADE STUDY IS TO DEVELOP TOP LEVEL CONCEPTUAL ARCHITECTURE DESIGNS FOR THREE DIFFERENT POWER DISTRIBUTION SYSTEMS AND TO PERFORM A TRADE STUDY COM | 2020-05-13 → 2020-12-17 | $115K |
| 80LARC21FA004 | IDENTIFICATION AND ASSESSMENT OF TECHNOLOGY PUSH FOR HUMAN LANDING SYSTEM APPLICATIONS | 2021-09-08 → 2022-05-16 | $77K |
| 80LARC19F0074 | TRADE STUDY, MODELING, AND ANALYSIS OF ROBOTIC DOCKING AND BERTHING AT THE LUNAR ORBITAL PLATFORM-GATEWAY. NASA SEEKS TO CONSTRUCT THE LUNAR ORBITAL PLATFORM-GATEWAY OVER A PERIOD STARTING FROM 2020 AND ENDING IN 2028. ALTHOUGH DESIGNED TO BE A MANNED SPACE STATION, IT IS EXPECTED THAT THE GATEWAY WILL BE UNOCCUPIED FOR LONG STRETCHES TOTALING OVER 90% OF ITS LIFESPAN. TASKS SUCH AS DOCKING, BERTHING, MAINTENANCE, AND OTHER MANIPULATION TASKS DURING THE UNOCCUPIED PHASES MUST BE PERFORMED BY ROBOTS. SINCE THE ROUND-TRIP COMMUNICATION TIME IS APPROXIMATELY 3 SECONDS, FULL TELEOPERATION IS NOT FEASIBLE, AND SOME DEGREE OF SUPERVISED AUTONOMY WILL BE REQUIRED. THE OBJECTIVES OF THIS WORK ARE TO: 1) PERFORM A STUDY INCLUDING THE MODELING AND ANALYSIS OF SENSING AND CONTROLS REQUIREMENTS TO ENABLE SUPERVISED AUTONOMOUS ROBOTS TO PERFORM DOCKING, BERTHING, AND MAINTENANCE OPERATIONS, AND 2) PERFORM A TRADE STUDY WHICH WILL ASSESS THE STATE OF THE ART IN PLANNED GATEWAY ROBOTS TO INFORM THE DESIGN OF NEW ROBOTIC TOOLS TO ASSIST IN DOCKING AND BERTHING. | 2019-05-29 → 2019-09-30 | $24K |
| 80LARC21F0078 | LUNAR METEOROID EJECTA MODEL REVIEW. PARTICIPATE AS A MEMBER OF THE LUNAR METEOROID EJECTA MODEL REVIEW TEAM TO PROVIDE AN EVALUATION OF THE NEW NASA LUNAR METEOROID EJECTA MODEL | 2021-02-02 → 2021-12-31 | $13K |